design-to-cost
An approach to managing a system/software project to hold the project to a predetermined cost. Actual and projected costs are closely tracked, and actions such as deleting or postponing lower-priority requirements are taken if costs threaten to exceed targets. Also called cost as an independent variable (CAIV).
- スピーチの一部 noun
- 産業/ドメイン コンピュータ; ソフトウェア
- カテゴリ Software engineering
- Organization: IEEE Computer Society